Locomotives
Locomotives
REMOTORIZATION OF DMOT 953 FOR GYSEV – 2019
INSTALLATION OF “GREEN CIRCLE” IN THE V43 431 LOCOMOTIVE FOR MÁV-START – 2017
DESIGN THE RUBBER-SPRING SUPPORT AND THE NOSE-SUSPENSION FOR THE V63 LOCOMOTIVE FOR MÁV-START – 2016
INSTALLATION OF EVM-120 SYSTEM IN CLASS 47 FOR CRS HUNGARY – 2016
DESIGN OF THE ELECTRIC HEATING FOR M40 LOCOMOTIVE FOR GYSEV – 2012
INSTALLATION OF EVM-120 SYSTEM IN LUDMILLA FOR GYSEV – 2012
DESIGN OF THE DRIVE SYSTEM FOR THE HYBRID MK48 LOCOMOTIVE FOR SZILVÁSVÁRAD – 2012
DESIGN OF THE DRIVE SYSTEM FOR THE HYBRID MK48 LOCOMOTIVE FOR LÁÉV – 2009
MODERNIZATION OF DIESEL-ELECTRIC LOCOMOTIVE TYPE A61-017 (NOHAB) (2001)
Service Company MÁV Északi Járműjavító Ltd. has made the remotorization and modernization of the diesel-electric locomotive type A61 by the order of Hungarian State Railways (MÁV). The locomotive was given a new track-number and it is a constant motive power unite for the measuring coach of MÁV.
All documentation was made by INVENT Ltd. starting with authority approval documentation, brake system calculation and finishing with the documentation of mechanical parts for manufacturing. Our Company assisted in the installation of the prototype vehicle as our Client requested.
Beside the restoration of the main diesel engine the auxiliaries were renewed completly. A diesel-generator set for the auxiliaries was built in replacing the boiler and water tank. The mechanical driving system was replaced by a hydrostatic one. The fresh air system, the exhaust system, the engine colling system and the fuel system and the hyrostatic system was designed as well.
REMOTORIZATION OF M62R DIESEL-ELECTRIC LOCOMOTIVE, MODERNIZATION OF THE AUXILIARIES – 2000
Service Company MÁV Északi Járműjavító Ltd. has made the remotorization and modernization of the diesel-electric locomotive type M62 by the order of Hungarian State Railways. The main engine set was made by companies Motoren und Turbinen Union and Lechmotoren (Germany), the control system was developed by Ganz Ansaldo.
All documentation was made by INVENT Ltd. starting with authority approval documentation, Finite Element Method calculation, brake system calculation, finishing with the documentation of mechanical parts for manufacturing. Our Company assisted in the installation of the prototype vehicle as our Client requested.
The auxiliaries were renewed too, there was built in a hydrostatic drive instead of a mechanical drive. The accessories of the diesel engine like fresh air system, exhaust system, water-cooling and fuel system were modified to a great extent.
It was an interesting work to design the balance mass because of the lighter diesel engine, and design a special jig for welding of supports for main engine set. The jig was used to manufacturer’s satisfaction.
Railcars
Railcars
ETCS INSTALLATION DOCUMENTATION FOR THE FLIRT EMUS FOR STADLER – 2019
INSTALLATION OF A WHEELCHAIR LIFT IN THE DESIRO RAILCAR FOR MÁV-START – 2018
BZ MOT COOLING UNIT COVER MÁV-START – 2016
INSTALLATION OF THE EVM-120 SYSTEM IN THE 5147 TWIN-RAILCAR FOR GYSEV – 2012
HYBRIDIZATION ANALYSIS FOR THE 5147 TWIN-RAILCAR FOR GYSEV – 2012
INSTALLATION OF THE EVM-120 SYSTEM IN THE 5047 RAILCAR FOR GYSEV – 2011
BZ TWIN RAILCAR – 2004
Production documentation of the connected end walls, the gangway-bellows and the connections.
Passenger coaches
Passenger coaches
MODIFICATION OF THE DRIVERS’ CAB AT 80-55 CONTROL-CAR – 2017-2018
INSTALLATION OF THE “GREEN CIRCLE” IN 20-67 COACH – 2017
INSTALLATION OF THE “GREEN CIRCLE” IN 21-05 COACH – 2017
INSTALLATION OF THE “GREEN CIRCLE” IN 29-05 COACH – 2016
INSTALLATION OF THE “GREEN CIRCLE” IN 20-35 COACH – 2016
INSTALLATION OF EVM-120 SYSTEM IN 80-76 CONTROL-CAR – 2012
OSE BMPZ – 2002
Slight modification and homologation of the documentations of OSE Bmpz passenger coach
Wagons
Wagons
Authority documentation of flat-wagon Slmmps for MÁV-VAGON – 2017
MODIFICATION DOCUMENTATION OF FLAT-WAGON PAKS FOR MÁV-VAGON – 2016
Lgns for MÁV-VAGON – 2007
Hmrrs twin wagon – 2007
Hmrrs twin wagon has been created from Gbs wagons for MÁV CARGO. The roof, consists of two parts ensures both crane- and forklift loading.
Our Company created the documentation of the underframe modification, the documentation of the end-walls and the roof system. The design was supported by VEM simulation.
Container-flat wagon WTC 49’ Lgss – 2003
MÁV Debreceni Járműjavító Ltd. assembled 40’ container flat-wagon using isothermic-wagon underframe by the order of INTERCONTAINER-INTERFRIGÓ.
All documentation was made by INVENT Ltd. starting with authority approval documentation, strength calculation of the underframe, brake system calculation, finishing with the documentation of mechanical parts for manufacturing. Our Company assisted in the installation of the prototype vehicle as our Client requested. We saw the static and the dynamic strength tests through including the brake measurements.
We successfully aligned the technical solutions used to reconstruct the wagon with the Client’s technical abilities, thus we could achieve cost reduction in the production.