Railcars

ETCS INSTALLATION DOCUMENTATION FOR THE FLIRT EMUS FOR STADLER – 2019

INSTALLATION OF A WHEELCHAIR LIFT IN THE DESIRO RAILCAR FOR MÁV-START – 2018

BZ MOT COOLING UNIT COVER MÁV-START – 2016

INSTALLATION OF THE EVM-120 SYSTEM IN THE 5147 TWIN-RAILCAR FOR GYSEV – 2012

HYBRIDIZATION ANALYSIS FOR THE 5147 TWIN-RAILCAR FOR GYSEV – 2012

INSTALLATION OF THE EVM-120 SYSTEM IN THE 5047 RAILCAR FOR GYSEV – 2011

BZ TWIN RAILCAR – 2004

Production documentation of the connected end walls, the gangway-bellows and the connections.